Upgrades & EV

Installing a Level 2 EV Charger at Home: A Charlotte Guide

How long installation takes, whether you need a panel upgrade, and how to stack the federal credit with Duke Energy rebates.

Charging an EV on a regular outlet adds about 4 miles of range per hour. A Level 2 charger adds 25 to 40. For most drivers, that is the difference between worrying about range and never thinking about it.

Do you need a panel upgrade?

Not always. We start with a load calculation that adds up everything your home draws. Many homes with 200-amp service can add a 40 or 48-amp charger without changes. Homes with 100-amp panels may need an upgrade or a load management device.

Where to put the charger

  • Close to where the charge port ends up when you park.
  • Inside the garage if possible, to protect the cable.
  • Within reach of a second car if you plan to add one.

What installation includes

  1. Load calculation and site visit
  2. Permit filed with Mecklenburg County
  3. Dedicated circuit and breaker
  4. Charger mounted, configured and tested with your car
  5. Inspection scheduled and passed

Credits and rebates

Federal tax credits and Duke Energy rebates change often. We check what is available on your install date and help with the paperwork.

Most BrightWire EV charger installs are completed within five business days of your first call.

Share this article
In this article

Join the Safety Club

Annual safety check, priority scheduling and 15% off repairs for $14.95 a month.

Electrical emergency?

Sparks, smoke or a burning smell? Call us 24/7. An electrician is usually there in about an hour.

More from the blog.